Construction process of bank protection


Application Number: 00107608
Application Date: 2000.05.15
Publication Number: 1295156
Publication Date: 2001.05.16
Priority Information:
International: E02B3/12
Applicant(s) Name: Wu Shanghua
Address:
Inventor(s) Name: Wu Shanghua
Patent Agency Code: 11100
Patent Agent: lu bing
Abstract After channels are dug along the bank, connected bags are arranged in the channels, and filled with concrete to form base part. Bags are stacked upwards from the base part and connected via horizontal connecting nails and vertical through nails. The bags are made to contact closely with the bank and the coagulated concrete forms a bank protecting structure.