Floor and beam structure construction method


Application Number: 00103052
Application Date: 2000.02.23
Publication Number: 1310275
Publication Date: 2001.08.29
Priority Information:
International: E04B1/16
Applicant(s) Name: Xie Minghui
Address:
Inventor(s) Name: Xie Minghui;Xie Ruilian
Patent Agency Code: 11127
Patent Agent: jiang xurong
Abstract The construction process of floor and beam structure includes the steps of: presetting beam supporting stand and spreading beam bottom formwork with brace; assembling side beam formwork and inserting side wall holding elements; spreading bed timber for floor and assembling holding mechanism and oblique pull rods; erecting floor supporting stand; spreading upper-layer of bed timbers; regulating side formwork verticality and spreading floor board. The construction process makes assembly safe, simple and fast and can ensure the verticality without shift and deformation caused by deposition and without need of fixing with iron wire and screw.